Application
Additional Requirements
- Permits that need a plan review such as a deck, basement finish, remodel or addition will need to go through the review process
- Demolition Requirements:
- Obtain demolition permits for all buildings, utilities and all accessory structures
- Complete Minnesota Pollution Control Agency forms
- Install and maintain erosion control measures for the site
- Remove abandoned cesspools, septic tanks and drain fields if applicable
- Demolish and remove the structure and foundation
- All materials must be transported off site and properly disposed of, including any hazardous materials. Call for visual inspection of this process
- Disconnect and properly abate all utilities connected to the property
- Electrical
- Sewer
- Water
- Gas
- Communications
- Cap any existing wells and record with the proper authority
- Remove the driveway surface to the point where this surface meets the street
- Obtain fill and compact this into the existing basement excavation site to bring the grade up to existing grade
- Grade the site to provide proper drainage and prevent the accumulation of standing water
- Over seed the site with a grass mixture suitable for this purpose.
- Solar Panel Information
Fees
Resources
Questions? Contact
Building Inspections Department
100 Civic Center Parkway, Burnsville, MN 55337
Email
952-895-4444